Table of Contents
- 1 What is operational estimating?
- 2 What is sectional bill?
- 3 What are the components of bill of quantities?
- 4 What is unit rate estimate?
- 5 What is an elemental bill?
- 6 What are the function of bill of quantity?
- 7 Who prepares bill quantity?
- 8 What are the functions of bill of quantities?
- 9 How is an operational Bill different from a bill of quantities?
- 10 When to use a bill of quantities and cost estimation?
- 11 What do quantity surveyors know about construction costs?
What is operational estimating?
Introduction. Operational rate estimating is a method used to calculate building costs. In operational rate estimating a distinct parcel of work is priced as a package. This is as opposed to projects where each unit of the bill of quantities are priced individually.
What is sectional bill?
It is issued to tenderers to allow them to prepare a price for carrying out the works.
What are the types of BOQ?
According to NRM2, RICS new rules of measurement, Detailed measurement for building work, there are two types of bill of quantities; firm and approximate.
What are the components of bill of quantities?
Composition of Bills of Quantities
- Form of Tender (including certificate of bona fide tender)
- Summary (or Main Summary)
- Preliminaries, comprising two main section as follows:
- Information and requirements; and.
- Pricing schedule.
- Measured works (incorporating the contractor designed works eg.
- Risks;
- Provisional sums;
What is unit rate estimate?
Estimating with unit rates A unit-rate contains the average amount of resources you need to install one unit (piece, meter, kg, etc.) you can find on an MTO. By multiplying all unit-rates by the quantities from all MTOs, a very detailed estimate of the project resources is obtained.
What is single rate estimation?
The primary function of approximate or preliminary estimating is to produce a forecast of the probable cost of a future project, before the building has been designed in detail and contract particulars prepared.
What is an elemental bill?
A bill of quantities (sometimes referred to as a ‘BoQ’ or ‘BQ’) is a document, typically prepared by a cost consultant (often a quantity surveyor), that provides measured quantities of the items of work identified by the drawings and specifications in the tender documentation for a project.
What are the function of bill of quantity?
The prime purpose of the Bill of Quantities (BQ) is to enable all contractors tendering for a contract to price on exactly the same information. Subsequent to this, it is widely used for post-tender work such as: material scheduling; construction planning; cost analysis; and cost planning.
What do you mean by bill of quantity?
The bill of quantities (sometimes referred to as ‘BoQ’ or ‘BQ’) is a document prepared by the cost consultant (often a quantity surveyor) that provides project specific measured quantities of the items of work identified by the drawings and specifications in the tender documentation.
Who prepares bill quantity?
What are the functions of bill of quantities?
What is bay method?
Bay method: This bay method is applicable in garages, factory, and railway platform where identical structures are visible. Bay in a construction term means a compartment of a building. The cost of one room is calculated first and it is multiplied by the number of bays.
How is an operational Bill different from a bill of quantities?
This form of document contrasts with that of bills of quantities in which such tendering and estimation is limited to the materials in the completed work.
When to use a bill of quantities and cost estimation?
Through cost management, during design, the quantity surveyors ensure that the design remains on budget, and on completion of drawings and designs the quantity surveyor may prepare a bill of quantities and cost estimation which is provided to the contractor for use in tenders submitting.
When do you need a bill of quantity?
A Quantity Surveyor is usually hired by the Owner / Architect at the inception of a project. prepares a final Bill of Quantities. The Bill of Quantity is a part of the bidding document, especially in Measure and Pay contracts.
What do quantity surveyors know about construction costs?
Professional quantity surveyors have full knowledge of construction costs like knowledge of cost price, work price, labor cost, and material cost, etc, and these factors help the quantity surveyors.